Construction Frequently Asked Quetions
Your Fischer Home goes through several key stages during the build. While each home is different, the general sequence includes:
- Site preparation and foundation
- Framing
- Mechanical rough-ins (plumbing, electrical, HVAC)
- Pre-drywall walkthrough
- Insulation and drywall
- Interior finishes (cabinetry, flooring, fixtures, paint)
- Exterior finishes (siding, landscaping, driveway)
- Final walkthrough and closing
Your Field Manager will keep you informed as your home moves through each stage.
Your Field Manager provides updates at each major construction milestone so you always know where things stand. You'll receive communication as your home progresses through framing, mechanical installations, drywall, finishes, and more. If you have questions between updates, your Field Manager is your direct point of contact.
Your primary opportunities to see your home in person during construction are the pre-drywall walkthrough and the final walkthrough, both coordinated by your Field Manager. For safety and liability reasons, visiting the construction site outside of scheduled walkthroughs is generally not permitted, as active job sites involve heavy equipment, open structures, and trade work in progress. Your Field Manager can answer any questions about what's happening on-site between visits.
he pre-drywall walkthrough takes place after your home is framed and the mechanical systems are installed, but before the drywall goes up. It's one of the most valuable steps in the process because it gives you the chance to:
- See the layout of your electrical, plumbing, and HVAC systems
- Verify the placement of outlets, switches, and fixtures
- Confirm that the structure matches your expectations
This is your window into the quality behind your walls before everything is sealed up.
Fischer Homes builds to high quality standards, and your home goes through multiple inspections throughout the construction process. These include internal quality checkpoints at key milestones as well as required municipal inspections for code compliance. As an ENERGY STAR certified partner, Fischer Homes single-family detached homes are also part of the EnergyWise program, which includes third-party energy testing — such as duct blaster and blower door tests — to verify insulation quality and reduce air leakage.
While Fischer Homes works to keep every build on schedule, factors like weather, material availability, or permitting can sometimes cause adjustments to the timeline. If a delay occurs, your Field Manager will communicate the update and revised schedule so you can plan accordingly. Keeping you informed is a priority throughout the process.
Quality is built into every stage of the process. Fischer Homes maintains high standards through:
- Multiple internal quality checkpoints during construction
- A dedicated Field Manager overseeing your build from start to finish
- Required municipal inspections at key milestones
- Third-party energy testing through the EnergyWise program
- The pre-drywall and final walkthroughs, which give you direct visibility into craftsmanship and attention to detail
he final walkthrough happens after construction is complete and before closing day. You'll walk through your finished home with your Field Manager to:
- Review every room and confirm finishes match your selections
- Test fixtures, appliances, and systems
- Note any items that need attention before you take ownership
Your Field Manager will document everything and make sure any outstanding items are resolved before you receive your keys.
Your Field Manager is your dedicated point of contact throughout the build. Whether you have a question about progress, a concern about something you've noticed, or need clarification on a timeline update, they're the person to reach out to. After closing, your support transitions to the Fischer Homes Customer Care team for any warranty or post-move-in needs.